Public changelog

What we shipped, in plain language.

Every release to Biztimize — new features, improvements, fixes, and breaking changes — documented here, for everyone. No marketing gloss.

3.39.10

A New Tenant Is Provisioned in Minutes, Not Hours

September 13, 2026
Production

Onboarding clones a template database, but the deploy never upgraded the template — so after the first deploy every new tenant fell back to the slow path.

Bug Fix

The Provisioning Template Is Upgraded on Every Deploy

Tenant onboarding clones a template database, but the deploy upgraded only live tenants and skipped the template by design. After the first deploy the template was one step behind and every new tenant fell back to a full migration run measured in hours rather than a clone measured in minutes.

The deploy now upgrades the template and checks it afterwards. Both steps are loud but do not fail the deploy: a stale template still provisions correctly, merely slowly.

System Global
3.39.5

Issues, Manual Timesheets and Project Roles

September 12, 2026
Production

An issue could not be raised anywhere in the product, hours the timer never captured could not be recorded, and confirming that work finished required the right to re-plan the whole network.

New Feature

Raise, Resolve and Close an Issue

The Issues & Changes tab was a read-only grid over an API no screen called, so an issue could not be raised anywhere in the product. It now carries Raise, Edit and the status moves Start, Resolve, Close and Reopen. Resolve asks for the resolution text first, because the server refuses to close an issue without one.

The project detail page can also be deep-linked to a named tab, so the dashboard’s governance panel opens straight onto the issues.

System Global
New Feature

Manual Timesheet Entry

A new Time Entry screen regularises hours the task timer never captured. The week is resolved from the employee and the date rather than picked, and there are named refusals for a future date, a project that cannot take actuals, a summary element, an activity from another project, and a line or a day over twenty-four hours. Hours transferred from a timer are corrected at the timer; hand-entered ones are edited here.

This also fixes costing: no path had ever stamped a timesheet line with the resource it belongs to, so every line was refused and no sheet could be posted at all.

System Global
New Feature

Project Director, Project Manager and Project User

Confirming an activity — the actual dates and the progress — used to require the right to re-plan, because it was an edit on the activity row. So a team member who could report “finished” could also rewrite the network. Confirmation is now its own act under its own permission, accepting only the three confirmation fields; a plan field sent with it is refused by name.

Three roles ship with it: Project Director (oversight and change approval), Project Manager (the create-and-run set) and Project User (view, confirm, record time, meetings and chat).

Because not every tenant runs the Project System, the existing Tasks-only Project Manager role is renamed Task Manager in place — same role, same people assigned to it, any administrator edits kept — and a new Project Manager is created for the Project System alone.

A Created project cannot accept confirmations at all, and the Network tab now says so instead of hiding the control: release the project from its header, then confirm.

Administrators: run setup_rbac per tenant after upgrading, and re-check who holds Project Manager.

System Global
3.39.6

Send Network Activities to Task Management

September 12, 2026
Production

An activity is the plan; a task is the execution record. Activities can now be sent to Tasks, with their dependencies, and progress reported on the task flows back to the activity.

Improvement

A Timer With No Employee Now Says Which Login and What to Fix

“User must have an associated employee record to track time” named neither the login nor where to link it, and read as a fault in the task. The message now says which login is unlinked and points at the employee master’s User account field.

Task Management Global
New Feature

One Task per Activity, With the Dependencies Carried Over

Send to Tasks on the Network tab creates a task for each activity under the project’s own task container, linked to the activity it came from, and mirrors the network’s relationships as task dependencies with their type and lag.

There is one writer per direction. The plan flows activity to task: dates, duration, effort, WBS, the critical flag and the assignee, and re-running re-syncs those columns without rescheduling the whole container. Progress flows task to activity: the actual dates and percentage written on the task are reflected onto the activity, and confirming a linked activity directly is refused by name — an activity that has been sent to Tasks is worked on the task.

Refusals are per activity and reported — not scheduled, nobody named, task already finished — while a Created or Closed project refuses the whole run.

System Global
3.39.7

See the Document You Are Approving

September 12, 2026
Production

The approval dialog gains a Document tab showing the live document, the credit and debit note print form was rebuilt, and several statements were reading the transaction-currency amount where they needed the rupee one.

Bug Fix

Rounding Goes to the Round Off Account or Nowhere

A sales invoice’s rounding difference was posted to whichever account happened to be matched first on an unordered search. On one tenant that scattered rounding across four accounts, 734 entries of it into an account that had been deleted, and put 109 lines into other income. The difference now goes to a configured round off account or is not posted at all.

Finance Global
Bug Fix

Statements Read the Company-Currency Amount

A journal line carries both the transaction amount and its company-currency value, and several readers had the wrong one. Summing the transaction amount mixes currencies, and it scores a purely company-currency leg — an exchange difference, which has no foreign amount by design — as zero.

That is how a correctly posted exchange gain stayed invisible on the GL ledger, the Trial Balance, the P&L, the Schedule III set and the Bank Book. All of them now read the company-currency figure.

Finance Global
Improvement

A Printable Credit and Debit Note, and Sales Orders on a Line

The note print form was rebuilt, and a note line can now cite more than one sales order — an adjustment frequently spans several. The AP posting configuration also gets a maintenance screen, which it has never had.

Finance Global
New Feature

A Document Tab on the Approval Dialog

An approver can now read the document itself — header, parties, amounts and line items — without leaving the approval.

It is derived from the live document, never from the snapshot taken when the workflow started, so it shows what is actually being approved. And the approval is the authorisation: requiring the owning module’s permission on top would blank the tab for exactly the finance and management approvers the workflow routed to. A document type nobody has registered still renders, by inspection, and every field is read under its own guard so one unreadable value cannot take the panel down.

Workflow Global
3.39.0

A Foreign Advance May State the Bank’s Own Rupee Figure

September 11, 2026
Production

Six decimals of exchange rate cannot always reach the amount the bank actually debited, so operators were nudging the rate to express an amount they already had in front of them. The amount can now simply be stated.

New Feature

State the Value, Derive the Rate

On a USD 1,00,000 advance, one tick of the sixth decimal moves the rupee value by ten paise — so the figure on the bank’s advice is simply not on that grid. Operators were inventing a rate to state an amount, and leaving a rate in the ledger that nobody had quoted.

A Value in company currency box on the advance form takes the bank’s own figure and derives the rate from it. There is still exactly one source for the rupee side; only which of the two it is changes. Leaving the box empty — the default, and every advance raised before this — derives the value from the rate, so no existing document behaves differently.

Three figures are refused: a rupee value on a home-currency payment, one implying a rate of exactly 1.000000, and one more than 10% away from the rate beside it — that is a figure in the wrong box, not a rounding correction.

Applying the advance apportions the stated amount rather than re-multiplying a rounded rate, so applying it in full gives back precisely what went out, and the reversal carries the stated value too. The rupee side of the journal is now a residual, as the foreign side always was — which also fixes a latent defect where an advance with a bank charge balanced exactly in dollars and was out by four paise in rupees.

Administrators: run batch_migrate --app fi_ap_core per tenant. No new permissions.

Finance Global
3.39.1

Project Chat, With Customers and Vendors in the Room

September 11, 2026
Production

Every project gets a conversation that employees, customer contacts and vendor contacts share — but not under one rule, because the asymmetry is the point. Plus browser and phone notifications, and a customer portal administration screen.

Bug Fix

The Notification Bell Never Moved on a Tenant

The two ends of the live notification channel spelled the tenant’s name differently, and sending to a channel nobody has joined is a silent no-op — so the bell simply never moved. There is now one definition of that name, shared by both ends.

System Global
Improvement

Customer Portal Administration, and a Steadier Task Worksheet

Portal users, their projects and their access can now be administered from a screen rather than by hand, and the task worksheet’s change tracking was rewritten and covered by tests, so an edit is saved once and exactly as typed.

System Global
New Feature

A Conversation per Project

Employees, customer contacts and vendor contacts all talk in one project room. They are not admitted under one rule, and that asymmetry is deliberate: the employee roster is tenant-wide, so an employee is in every room, while an outsider is admitted to one. Flattening that would let one customer read another customer’s project conversation.

An outsider can talk, cannot widen the room, and never starts one. One place in the code decides who is in a room, and the REST API, the live socket and the customer portal all ask it — the portal reaching the same conversation through its own address, because a customer’s session is confined to the portal at the edge.

Nothing is written to the database from a socket frame.

System Global
New Feature

Notifications That Reach People Who Have Not Opened the Room

The member list is the audience: whoever the member dialog shows, plus followers, the project manager and anyone mentioned. Notifying only people who had already opened a room was tried first, and left the first message in every room reaching nobody while the member dialog still listed them.

The bell merges a conversation into one row: one unread entry per room, updated in place and bumped to the top, cleared when the room is marked read. Keeping only mentions was tried first and was the wrong lever — the answer to fifty rows is to merge them, not to discard forty-nine conversations.

Browser and phone notifications arrive as exact complements: the page raises one while a window is visible and the service worker when none is, tagged per room so one project’s message cannot replace another’s in the tray.

System Global
3.39.2

A WBS Element Can Be Set on the Task That Needs One

September 11, 2026
Production

The timesheet pull refuses a task with no WBS element and tells the user to set one — and nothing in the product could.

Bug Fix

The Timesheet Transfer Failed Where the Preview Worked

Pulling timesheet hours into a project failed with a server error while the preview of the same pull worked, because the transfer reached for a definition through a module that does not re-export it.

System Global
New Feature

WBS Element on the Task Edit Screen

The task edit screen gains a WBS element picker, and the task detail screen shows it. Where the signed-in user may not read the project structure the picker is disabled and the stored value is left alone rather than cleared on save.

Task Management Global
3.39.3

Sales Order BOM Tree, Goods Receipt Printout, and a Project Go-Live Date

September 11, 2026
Production

The sales order BOM list reads as a tree, the goods receipt printout carries more of the document, and a project records the date it is expected to go live.

Improvement

The BOM List Reads Down the Tree

The sales order BOM list and detail show the structure’s level and its place under its parent, so a three-level explosion reads as one contiguous tree starting at its finished good rather than as an unordered list of structures.

Production Global
Improvement

More of the Document on the Goods Receipt Printout

The goods receipt printout carries additional document detail that previously had to be looked up on screen.

Inventory Global
New Feature

Go-Live Date on a Project

A project can record the date it is expected to go live, and the project list and dashboard report against it.

System Global
3.38.5

The Running Balance and the Grid Now Sort the Same Way

September 10, 2026
Production

The Balance column was accumulated in statement order while the grid sorted on the bare posting date, so every block of same-date rows read backwards on the vendor and customer ledgers — from first paint, not only after a header click.

Bug Fix

Same-Date Rows Read in Statement Order

Ties are the rule, not the exception — a journal puts every one of its legs on the same day by definition. On one tenant, 751 of 1,152 vendor rows, 2,320 of 2,637 customer rows and 31,638 of 32,888 GL lines share a posting date with a sibling.

Where the balance is accumulated in one order and the rows are shown in another, a run of credits appears to shrink the payable. The accumulation order is now stamped on each row and the Posting Date column sorts by it outright — which also settles the rows whose displayed date falls back to the document date.

Under any other sort the balance genuinely cannot chain, so it is greyed and italicised with a tooltip saying why. Greyed, not blanked: it is still that row’s own true balance. The Excel export cannot carry a tooltip, so it is always written in statement order with a header line saying the file does not follow the screen.

A balance accumulated in floating point lands a settled row a hair above zero rather than on it, which painted it as still owed. It is now compared against half a paisa.

Finance Global
3.38.4

Scheduling That Knows Who Is Already Busy

September 10, 2026
Production

A plain critical-path pass answers “how long if everyone is free”. Resource capacity is now reported on every run and acted on when the project asks for it, activity numbers allocate themselves, and the Gantt stops overlapping the page below it.

Bug Fix

The Gantt No Longer Overlaps the Page Below It

A Gantt chart is a split pane, and the stylesheet for the splitter was never loaded, so both halves rendered full width and stacked — the chart landing on top of whatever followed it, and worse the more activities there were. The chart also sizes to its row count now, rather than leaving three bars above 300px of empty timeline.

System Global
New Feature

Capacity Is Reported on Every Run, and Moved Only When Asked

Three unlinked three-day activities with one person on all three all started on day one and asked that person for twelve hours a day against a capacity of eight. Nothing said so.

Capacity is now two separate acts. Conflicts are reported on every run and on page load; levelling moves work, and only when the project is set to. That choice is stored on the project and applied by one switch that schedules and saves — as a preview-then-commit pair a refresh lost it, and as a per-run flag the next plain run silently un-levelled the plan and restored an over-allocation nobody had chosen to accept.

Levelling adds real dependencies rather than just moving dates, so float and the critical chain stay meaningful; it never moves a pinned activity; and zero capacity on file means “nothing to compare”, never “no hours”.

Why nobody had ever seen an over-allocation: adding a person through Project People created their row with zero capacity, a rule meant for external contacts. Only external kinds are zeroed now, and capacity is editable for the first time, from a column on the Project People page. Existing employee rows already stored at zero are not repaired automatically — audit them.

System Global
New Feature

An Activity Number Is Allocated When Left Blank

Leaving the activity code empty now allocates one per project: multiples of ten, four digits, so 0015 can still be inserted by hand between 0010 and 0020. The maximum is read as a number, never as text, and a code that has been used and deleted is never reissued.

System Global

Want a walkthrough of what's new?

We run monthly release briefings for customers — what shipped, what changed, what's next. Bring your team.